factograf
EN

Subway system in Greater Tokyo, Japan

Toei Subway

Toei Subway

Key facts

inceptionDecember 4, 1960
instance ofrapid transit
countryJapan
located in the administrative territorial entityTokyo
All data from the card 12
Native name
都営地下鉄
Locale
Tokyo, Japan
Transit type
Rapid transit
Number of lines
4
Number of stations
106
Daily ridership
2.60 million (FY 2025)
Website
Toei
Began operation
4 December 1960
Operator
Tokyo Metropolitan Bureau of Transportation
System length
109.0 km (67.7 mi)
Track gauge
1,435 mm (4 ft 8+1⁄2 in) (Asakusa and Ōedo lines)1,372 mm (4 ft 6 in) (Shinjuku line)1,067 mm (3 ft 6 in) (Mita line)
Electrification
Overhead line, 1,500 V DC

The Toei Subway (Japanese: 都営地下鉄; lit. 'metropolis-operated subway') is a major rapid transit system in Tokyo, Japan, operated by the Tokyo Metropolitan Bureau of Transportation under the Tokyo Metropolitan Government Ordinance on Underground High-Speed Trains. The Toei Subway lines were originally licensed to the Teito Rapid Transit Authority (the predecessor of Tokyo Metro) but were constructed by the Tokyo Metropolitan Government following transfers of the licenses for each line in 1958.

It is the one of Tokyo's two subway operators, with an average daily ridership of 2.85 million; the other operator, the Tokyo Metro, carries approximately 6.52 million passengers per day, as of 2023. The subway has run at a financial loss for most of its history due to high construction expenses, particularly for the Oedo Line. However, it reported its first net profit of ¥3.13bn ($26.9 mil) in FY2006.

Tokyo Metro and Toei Subway form completely separate networks. While users of prepaid rail passes can freely interchange between the two networks, regular ticket holders must purchase a second ticket, or a special transfer ticket, to change from a Toei line to a Tokyo Metro line and vice versa. The sole exceptions are on the segment of the Toei Mita Line between Meguro and Shirokane-Takanawa, where the platforms are shared with the Tokyo Metro Namboku Line, and at Kudanshita on the Shinjuku Line, where the platform is shared with the Tokyo Metro Hanzomon Line. At these stations, it is possible to change between the networks without passing through a ticket gate. It is one of only two rapid transit systems operating on 3 track gauges, the other being the Barcelona Metro, Spain, using narrow, standard and broad gauge.

History

A crowded platform on the Teito Rapid Transit Authority line during the 1950s.
A crowded platform on the Teito Rapid Transit Authority line during the 1950s.

In 1920, Tokyo City, the administrative predecessor of today’s 23 special wards, announced its first formal subway development proposal through Tokyo City Notification No. 2 of 1920 (大正9年東京市告示第2号), designating seven routes. Consistent with the city’s broader policy of public ownership and operation of urban transportation, the network was intended to be constructed and managed municipally. However, the Great Kantō Earthquake struck on September 1, 1923, inflicting catastrophic damage on central Tokyo and altering the city’s urban and transportation planning priorities.

In 1925, the Ministry of Home Affairs issued Ministry of Home Affairs Notification No. 56 of 1925 (大正14年内務省告示第56号), which formally designated five routes. Under this framework, Tokyo City obtained operating licenses for four of the five proposed subway lines. However, burdened by substantial public debt in the aftermath of earthquake reconstruction, the city faced strong opposition from both the Ministry of Home Affairs and the Ministry of Finance. As a result, Tokyo City was unable to secure final approval to commence construction, effectively halting its municipal subway plans.

At the time, the only subway line, now known as the Ginza Line, was constructed and operated separately by two private companies, the Tokyo Underground Railway and the Tokyo Rapid Railway, with through services between the two operators.

After the outbreak of World War II, the Japanese government integrated these two companies in 1941 to form the Teito Rapid Transit Authority (TRTA), commonly known as Eidan, which later became the predecessor of today's Tokyo Metro.

Postwar construction

In Tokyo during the 1950s, post–World War II economic expansion led to rapid population growth and a sharp increase in road traffic. As a result, the effectiveness of existing public transport infrastructure, such as the Tokyo Toden (tram) system, steadily declined due to chronic road congestion, while the existing Teito Rapid Transit Authority subway network alone was unable to keep pace with rising transportation demand.

In 1954, the Tokyo Metropolitan Assembly adopted a resolution to construct a public subway system in addition to the network operated by the Teito Rapid Transit Authority. In accordance with urban planning directives, the Tokyo Metropolitan government Tokyo Metropolitan Bureau of Transportation and Keikyu corporation obtained a license from the Teito Rapid Transit Authority to build its first line between Kuramae and Magome, and began construction of the line as part of the Toei Subway system in 1958.

Since the Toei Subway began operations on the Asakusa Line between Asakusabashi and Oshiage in 1960, with through services to the Keisei Line, the system has expanded steadily, with the opening of the Mita Line in December 1968, the Shinjuku Line in December 1978, and the Ōedo Line in December 1991. The Mita Line was extended between Meguro and Mita stations, and the Ōedo Line entered full operation.

Lines

The Toei Subway is made up of four lines operating on 109.0 kilometers (67.7 mi) of route.

Name No. Route Stations Length
km (mi)
Opened Daily ridership
(FY2024)
Gauge
Asakusa Line 1 Nishi-magome – Oshiage 20 18.3 (11.4) 1960 1,457,778 1,435 mm (4 ft 8+1⁄2 in)
Mita Line 6 Meguro – Nishi-takashimadaira 27 26.5 (16.5) 1968 1,292,710 1,067 mm (3 ft 6 in)
Shinjuku Line 10 Shinjuku – Moto-Yawata 21 23.5 (14.6) 1978 1,480,760 1,372 mm (4 ft 6 in)
Ōedo Line 12 Hikarigaoka – Tochōmae 38 40.7 (25.3) 1991 1,777,914 1,435 mm (4 ft 8+1⁄2 in)
Total: 106 109.0 (67.7) 5,281,532

Through services to other lines

The different gauges of the Toei lines arose in part due to the need to accommodate through services with private suburban railway lines. Through services currently in regular operation include:

Revenue and ridership

Icons of four lines, as the system consists of four lines, compared with Tokyo Metro’s nine.
Icons of four lines, as the system consists of four lines, compared with Tokyo Metro’s nine.

According to the company, an average of 2.34 million people used the company's four subway routes each day in 2008. The company made a profit of ¥12.2 billion in 2009.

Source: Tokyo Metropolitan Government

Net profit (loss), in million JPY
JFY Asakusa Mita Shinjuku Oedo Total
2006 6,714 2,170 9,328 (15,628) 2,584
2007 8,849 3,335 11,193 (12,398) 10,980
2008 15,514 4,197 12,197 (11,580) 20,329
2009 9,676 4,102 10,653 (12,077) 12,355
2010 8,660 4,143 9,833 (13,238) 9,399
2011 7,853 3,649 9,543 (12,395) 8,650
2012 10,339 4,492 8,223 (10,296) 12,275
2013 10,244 4,756 8,586 (8,143) 15,446
2014 10,235 4,529 8,751 (4,939) 18,577
2015 10,716 5,831 10,581 (1,272) 25,856
2016 12,810 8,156 11,627 317 32,911
2017 13,496 9,276 10,535 876 34,184
2018 14,335 9,954 11,378 981 36,649
2019 12,279 8,356 10,460 (10,194) 20,912
2020 371 (687) (41) (14,226) (14,584)
2021 1,467 1,045 2,269 (11,218) (6,435)
2022 4,265 1,595 3,514 (9,823) (447)
2023 8,666 6,302 6,249 (3,203) 18,013
2024 15,344 7,395 6,736 (3,094) 26,882

Note: All financial figures are in million ¥.

100
200
300
400
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
  •   Asakusa line
  •   Mita line
  •   Shinjuku line
  •   Oedo line

Ridership

Source:

Average daily ridership by line
JFY Asakusa Mita Shinjuku Oedo Total
1960 15,622 —N/a 15,622
1961 22,450 —N/a 22,450
1962 35,755 —N/a 35,755
1963 86,345 —N/a 86,345
1964 137,250 —N/a 137,250
1965 157,354 —N/a 157,354
1966 175,418 —N/a 175,418
1967 193,386 —N/a 193,386
1968 263,814 66,269 —N/a 330,083
1969 364,730 77,691 —N/a 442,421
1970 409,074 89,931 —N/a 499,005
1971 436,813 104,550 —N/a 541,363
1972 452,643 202,169 —N/a 654,812
1973 446,268 271,331 —N/a 717,599
1974 448,438 314,169 —N/a 762,607
1975 454,128 358,890 —N/a 813,018
1976 439,904 369,432 —N/a 809,336
1977 445,523 384,117 —N/a 829,640
1978 431,945 377,378 21,300 —N/a 830,623
1979 426,857 371,827 25,843 —N/a 824,527
1980 461,443 416,535 228,727 —N/a 1,106,705
1981 437,342 382,758 244,068 —N/a 1,064,168
1982 439,898 386,816 265,336 —N/a 1,092,050
1983 444,301 394,427 295,134 —N/a 1,133,862
1984 454,328 403,323 325,339 —N/a 1,182,990
1985 486,528 452,927 380,202 —N/a 1,319,657
1986 510,761 458,052 419,178 —N/a 1,387,991
1987 485,323 412,578 408,641 —N/a 1,306,542
1988 503,786 422,917 430,756 —N/a 1,357,459
1989 516,641 430,257 467,084 —N/a 1,413,982
1990 570,129 500,635 569,942 —N/a 1,640,706
1991 564,197 450,923 511,797 6,191 1,533,108
1992 615,040 440,120 439,912 18,906 1,513,978
1993 613,652 509,723 587,701 25,273 1,736,349
1994 611,493 504,186 586,336 27,553 1,729,568
1995 592,921 484,725 597,769 28,827 1,704,242
1996 545,621 408,709 507,731 29,424 1,491,485
1997 540,378 408,408 501,698 46,254 1,496,738
1998 536,621 405,923 500,350 103,038 1,545,932
1999 527,616 391,542 491,402 112,027 1,522,587
2000 571,897 405,183 488,457 198,526 1,664,063
2001 584,414 428,021 474,087 453,027 1,939,549
2002 593,123 436,542 478,931 504,934 2,013,530
2003 579,757 436,556 476,024 562,405 2,054,742
2004 574,995 501,180 585,937 647,573 2,309,685
2005 582,599 513,229 592,756 681,623 2,370,207
2006 597,415 527,777 608,645 720,162 2,453,999
2007 623,714 550,688 646,548 781,487 2,602,437
2008 632,555 564,380 662,950 796,257 2,656,142
2009 627,217 566,862 665,233 792,256 2,651,568
2010 623,563 564,345 664,792 795,461 2,648,161
2011 605,990 553,538 654,031 780,714 2,594,273
2012 635,486 573,146 665,377 825,666 2,699,675
2013 657,513 589,097 689,609 859,196 2,795,415
2014 669,603 600,570 701,902 878,960 2,851,035
2015 696,743 620,076 724,915 914,012 2,955,746
2016 718,855 638,365 745,889 933,621 3,036,730
2017 742,803 657,460 772,415 956,041 3,128,719
2018 764,911 672,738 792,321 976,957 3,206,927
2019 767,994 678,499 794,117 978,206 3,218,816
2020 504,604 459,124 555,442 653,881 2,173,051
2021 522,336 483,114 584,354 676,730 2,266,534
2022 600,055 547,997 647,592 750,383 2,546,027
2023 683,003 606,811 704,235 836,179 2,830,228
2024 728,889 646,355 740,380 888,957 3,004,581
2025 762,395 674,222 767,340 920,462 3,124,419
1,000,000
2,000,000
3,000,000
4,000,000
60
65
70
75
80
85
90
95
00
05
10
15
20
25
  •   Asakusa line
  •   Mita line
  •   Shinjuku line
  •   Oedo line

Branding

Apart from its own logo, a stylized ginkgo leaf used as the symbol of the Tokyo Metropolis, Toei Subway shares a design language in common with Tokyo Metro. Lines are indicated by a letter in Futura Bold on a white background inside a roundel in the line color, with signs indicating stations adding the station number as well. Line colors and letter-designations are complementary with Tokyo Metro's, with none overlapping (e.g., the Mita Line's letter-designation is “I”, rather than “M”, which is used by the Tokyo Metro Marunouchi Line).

Informational signage is also designed identically, with platform-level station placards differing only in the placement of the bands in the line color: Toei Subway has two thin bands at the top and bottom, while Tokyo Metro has one wider band at the bottom (or, in the case of long, narrow placards, in a continuous band extending to the left and right along the wall itself).

Stations

Underground passage stairs at Toei Subway Iidabashi Station, equipped with wire-frame lighting.
Underground passage stairs at Toei Subway Iidabashi Station, equipped with wire-frame lighting.
The platform at Akabanebashi Station features glass blocks and tiles made in Italy embedded in the walls.
The platform at Akabanebashi Station features glass blocks and tiles made in Italy embedded in the walls.
Shinjuku-Nishiguchi Station exit
Shinjuku-Nishiguchi Station exit
3 images

There are a total of 99 unique stations (i.e., counting stations served by multiple lines only once) on the Toei Subway network, or 106 total stations if each station on each line counts as one station. Almost all stations are located within the 23 special wards, with many located in areas not served by the complementary Tokyo Metro network.

Rolling stock

5500 series
5500 series
6300 series
6300 series
6500 series
6500 series
10-300 series
10-300 series
12-000 series
12-000 series
12-600 series
12-600 series
E5000 series
E5000 series
5000 series
5000 series
5200 series
5200 series
5300 series
5300 series
6000 series
6000 series
10-000 series
10-000 series
12 images

Current vehicles

  • Asakusa Line – 5500 series and E5000 series (electric locomotives)
  • Mita Line – 6300 series and 6500 series
  • Shinjuku Line – 10-300 series
  • Oedo Line – 12-000 series and 12-600 series

Former vehicles

  • Asakusa Line – 5000 series, 5200 series and 5300 series
  • Mita Line – 6000 series and 10-000 series
  • Shinjuku Line – 10-000 series and 10-300R series

Read next

In 22 languages

Text from Wikipedia, CC BY-SA 4.0 · Source article