factograf
EN

National railway system

Uzbek Railways

Uzbek Railways

Key facts

inception1994
instance ofnational railway
countryUzbekistan
located in the administrative territorial entityUzbekistan
All data from the card 10
Type
Joint-stock company
Industry
railway
Predecessor
Soviet Railways
Founded
1994
Headquarters
Tashkent, Uzbekistan
Area served
Uzbekistan
Services
Passengerrail transportcargohigh-speed rail
Owner
Government of Uzbekistan
Number of employees
54,700 (2017)
Website
railway.uz

Uzbekistan Railways is the national railway company of the Republic of Uzbekistan. It owns and manages all infrastructure and operating freight and passenger train services in the country, and has a near-monopoly on long-distance train travel in Uzbekistan. It is a vertically integrated state-owned stock company, formed in 1994 to operate railways within Uzbekistan. As of March 2017, the total length of its main railway network is 4,669 km (2,446 km of which is electrified).

Infrastructure

4,714 kilometres (2,929 mi) rail network carries about 40% of total freight volume in the country, and about 4% of the total land passenger volume. Around 2,350 km of the network is currently electrified, as of 2019.

Branches

Uzbekistan Railways has the following 6 regional railway junctions (Russian: Региональный железнодорожный узел (РЖУ); Uzbek: Mintaqaviy temir yo'l uzeli (MTU)):

No. Branch name in Russian Branch name in Uzbek Website Managed from
1 Кунградский РЖУ Qo‘ng‘irot MTU kungrad.aitm.uz Qońirat
2 Бухарский РЖУ Buxoro MTU buxoro-mtu.railwayinfra.uz Bukhara
3 Ташкентский РЖУ Toshkent MTU toshkentmtu.uz Tashkent
4 Кокандский РЖУ Qo‘qon MTU kokand.aitm.uz Kokand
5 Каршинский РЖУ Qarshi MTU qarshimtu.uz Qarshi
6 Термезский РЖУ Termiz MTU N/A Termez

High-speed lines

The Tashkent–Bukhara high-speed rail line started operation in September 2011 after being upgraded.

Line Termini Length Type Maximum speed Opening Status
Tashkent–Bukhara Tashkent–Bukhara 600 km (370 mi) New 250 km/h (160 mph) 2011 Operational
Bhukhara–Khiva Bukhara-Khiva 465 km (289 mi) New 250 km/h (160 mph) 2030 Under Construction

Uzbek Railways has direct passenger train links to Moscow, Ufa, Chelyabinsk, Novosibirsk, Saratov, Penza and Saint Petersburg (via Kazakhstan). From Almaty connecting trains are provided to Urumchi in China. Also Tajik trains of Dushanbe-Moscow (No: 319), Moscow-Dushanbe (No: 320), Khujand-Saratov (No: 335), Khujand-Atyrau (No: 335), Saratov-Khujand (No: 336), Khujand-Moscow (No: 359), Moscow-Khujand (No: 360), Kanibadam-Bokhtar (No: 389), Bokhtar-Kanibadam (No: 389) and Atyrau-Khujand (No: 692) passes through Uzbekistan.

The Karshi-Termez line, which extends across the border into Afghanistan, is being electrified. In March 2018, Uzbek Railways began a new service, connecting Tashkent with Balykchy. The China–Kyrgyzstan–Uzbekistan railway, which started construction in 2025, aims to build 523 km of new track (50 km of which is in Uzbekistan) connecting Kashgar, China via Kyrgyzstan to Andijan.

Rolling stock

Passenger trains

Class Type Number Year Manufacturer Notes
ER9E EMU 1962 RVR refurbished
ER2 EMU 1962 RVR refurbished
Talgo 250 (Afrosiyob) EMU 6 2011–2021 Talgo
RegioPanter EMU 30 planned after 2024 Škoda
UTY EMU-250 EMU 6 planned after 2027 Hyundai Rotem planned
DMU

Freight

Read next

In 16 languages

Text from Wikipedia, CC BY-SA 4.0 · Source article