factograf
EN

Rail line in Western Japan

Inbi Line

Inbi Line

Key facts

inceptionDecember 20, 1919
instance ofrailway line, zairaisen, Local Transport Line of JR
countryJapan
located in the administrative territorial entityTottori Prefecture
All data from the card 16
Native name
因美線
Status
Operational
Owner
JR West
Locale
Western Japan
Termini
TottoriHigashi-Tsuyama
Stations
19
Type
Regional rail
Operator
JR West
Rolling stock
KiHa 40 series, KiHa 120 series, KiHa 121/126 series, KiHa 187 series, WT3000 series, WT3300 series, HOT7000 series, HOT3500 series DMU
Opened
1919
Line length
70.8 km (44.0 mi)
Number of tracks
Entire line single tracked
Character
Rural
Track gauge
1,067 mm (3 ft 6 in)
Electrification
None
Operating speed
110 km/h (68 mph)

The Inbi Line (因美線, Inbi-sen), sometimes romanized Imbi Line, is a railway line operated by the West Japan Railway Company (JR West) between Tottori, Tottori Prefecture and Tsuyama, Okayama Prefecture, Japan.

Route data

  • Operating Company:
  • Distance:
    • Tottori — Tsuyama: 70.8 km (44.0 mi)
  • Gauge: 1,067 mm (3 ft 6 in)
  • Stations: 19
  • Double-tracking: None
  • Electrification: Not electrified
  • Railway signalling:
    • Special automatic occlusive (track circuit detection type)

Stations

●: Stop ▲: Some services stop |: Pass
Line Name Distance
(km)
Rapid Connections Location
Imbi Tottori 鳥取 0.0   Sanin Main Line Tottori Tottori
Tsunoi 津ノ井 4.3    
Higashi-Kōge 東郡家 8.2     Yazu,
Yazu District
Kōge 郡家 10.3   Wakasa Railway Wakasa Line
Kawahara 河原 14.1    
Kunifusa 国英 17.4     Tottori
Takagari 鷹狩 19.8    
Mochigase 用瀬 21.1    
Inaba-Yashiro 因幡社 24.9    
Chizu 智頭 31.9 ● Chizu Express Chizu Line Chizu,
Yazu District
Haji 土師 35.6 ●  
Nagi 那岐 38.5 ●  
Mimasaka-Kawai 美作河井 48.5 ▲   Tsuyama Okayama
Chiwa 知和 52.0 ▲  
Mimasaka-Kamo 美作加茂 55.8 ●  
Miura 三浦 59.3 |  
Mimasaka-Takio 美作滝尾 61.5 |  
Takano 高野 66.7 ▲  
Higashi-Tsuyama 東津山 70.8 ● Kishin Line
Kishin
Tsuyama 津山 73.4 ● Kishin Line, Tsuyama Line

Rolling stock

Local

Limited Express

History

The Inbi Line was built by the Japanese Government Railway, with the first section opened from Tottori to Mochigase in 1919, extended to Chizu in 1923. The Tsuyama to Mimasaka-Kamo section, opened in 1928, was extended to Mimasaka-Kawai in 1931 and the line was completed with the opening of the section to Chizu (including a 3,077 m tunnel) in 1932.

CTC signalling was commissioned between Tottori and Chizu in 1994.

Read next

In 6 languages

Text from Wikipedia, CC BY-SA 4.0 · Source article