factograf
EN
Sign in

Light rail line in Cuenca, Ecuador

Cuenca Tramway

Cuenca Tramway

Key facts

instance oftram system
countryEcuador
located in the administrative territorial entityCuenca
All data from the card 9
Locale
Cuenca, Ecuador
Transit type
Light rail
Number of lines
1
Number of stations
27
Daily ridership
19,000
Began operation
25 May 2020
Number of vehicles
14
System length
10.7 km (6.6 mi)
Track gauge
1,435 mm (4 ft 8+1⁄2 in) standard gauge

The Cuenca Tramway (Spanish: Tranvía de Cuenca) is a tram line in the Ecuadorian city of Cuenca.

Background

Construction began in November 2013, with the city of Cuenca signing a US$142.6m contract with the CITA Cuenca consortium, which is led by Alstom and includes CIM, Ineo, and TSO, the same year. Testing of the tramway's Alstom Citadis rolling stock on the southernmost part of the line began in 2015, and test runs over the full route began in July 2018.

In September 2018 an agreement with Metro Tenerife was signed by Cuenca municipality to operate the tramway.

Route

The 10.7 km route begins at Parque Industrial and ends at Rio Tarqui, passing through the historic center, and as of 2018 was forecast to carry 120,000 daily passengers.

Read next

In 7 languages

Text from Wikipedia, CC BY-SA 4.0 · Source article